calculate_float_factor

Calculate the total float as a percentage between its earliest start schedule (ESS) and latest start schedule (LSS).

The schedule can be set with a float factor value using the P2Schedule:earliest_start_schedule_with_float_factor function.

Parameters: 
I/O Type Name Description
output integer factor percentage between 0% (=ESS) and 100% (=LSS)
Example: 
function ()
        io.write('\n')
end
Class: 
P2Schedule