Calculate the total float as a percentage between its earliest start schedule (ESS) and latest start schedule (LSS).
The schedule can be set with a float factor value using the P2Schedule:earliest_start_schedule_with_float_factor function.
| I/O | Type | Name | Description |
|---|---|---|---|
| output | integer | factor | percentage between 0% (=ESS) and 100% (=LSS) |