Get the cost per use for a resource.
The cost for the use of a resource is as a one-time cost incurred every time that the resource is used and can be set at the P2Resource:set_resource_cost_use function.
I/O | Type | Name | Description |
---|---|---|---|
input | integer | ID | resource ID |
output | float | cost | cost per use |
Step inside PMKC.